Mark Davis Sculpture at
Ann & Robert H. Lurie Children's Hospital of Chicago
October 2012
All 9 leaves have been installed.
Get the flash player here: http://www.adobe.com/flashplayer
October 2012
Delivery and Installation
Get the flash player here: http://www.adobe.com/flashplayer
October 2012
Leaves departing for Chicago from California (continued)
Get the flash player here: http://www.adobe.com/flashplayer
October 2012
Leaves departing for Chicago from California
Get the flash player here: http://www.adobe.com/flashplayer
October 2012
Schematic design for truck-loading configuration of custom-designed shelves to transport leaves
Get the flash player here: http://www.adobe.com/flashplayer
September 2012
Structural engineer final drawings for sculpture, Cambridge, Massachusetts
Get the flash player here: http://www.adobe.com/flashplayer
September 2012
More Leaf Progress
Get the flash player here: http://www.adobe.com/flashplayer
September 2012
Leaf Work
Leaf Work
Get the flash player here: http://www.adobe.com/flashplayer
September 2012
LED Light Testing
Get the flash player here: http://www.adobe.com/flashplayer
September 2012
Leaf Work
Get the flash player here: http://www.adobe.com/flashplayer
August 2012
Steel beam arrival
Get the flash player here: http://www.adobe.com/flashplayer
August 2012
Continued Work on Leaf Surfaces
Get the flash player here: http://www.adobe.com/flashplayer
August 2012
The Site
Get the flash player here: http://www.adobe.com/flashplayer
August 2012
Leaf Progress: Color in Action
Get the flash player here: http://www.adobe.com/flashplayer
August 2012
Further Progress on the Leaves
Get the flash player here: http://www.adobe.com/flashplayer
August 2012
Continued leaf progress
Get the flash player here: http://www.adobe.com/flashplayer
August 2012
Shipping to Sandblaster
July 2012
Continued leaf progress: painting, vacuum bag process, and carbon fiber layer
Get the flash player here: http://www.adobe.com/flashplayer
July 2012
Leaf Progress
Get the flash player here: http://www.adobe.com/flashplayer
July 2012
Pipe Fabrication
Get the flash player here: http://www.adobe.com/flashplayer
July 2012
Structural Steel Frame--in Process
Get the flash player here: http://www.adobe.com/flashplayer
July 2012
ADM-Works making progress on the leaves
Get the flash player here: http://www.adobe.com/flashplayer
June 2012
Vector Fabricating receives rolled pipe, steel cap plates, and hardware for fabrication of sculpture structure.
Get the flash player here: http://www.adobe.com/flashplayer
June 2012
ADM-Works creating molds for carbon fiber leaves as well as transportation cradles for leaves.
June 2012
Mark Davis created individual hand-painted go-by samples for ADM-Works for final painting in California.
June 2012
ADM-Works engaged a strength test for the connection points between the carbon fiber leaves and the hardware which connects to the steel members.
Get the flash player here: http://www.adobe.com/flashplayer
February 2012
Vector and iron workers removing column cladding in order to create an accurate 3D scan of the entire traffic island.
Get the flash player here: http://www.adobe.com/flashplayer
February 2012, Los Angeles
Section of the carbon fiber material and the LED light strand.
Get the flash player here: http://www.adobe.com/flashplayer
December 2011
Model # 3 created for 3D image scanning for precise production.
Get the flash player here: http://www.adobe.com/flashplayer
October 2011
Model # 2 with LED lights for presentation to Children's Memorial Hospital team for consideration.
Get the flash player here: http://www.adobe.com/flashplayer
September 2011
Mark Davis model for presentation to donor.
Get the flash player here: http://www.adobe.com/flashplayer
Newer Posts
Home
Subscribe to:
Posts (Atom)