October 2012

All 9 leaves have been installed.
Get the flash player here: http://www.adobe.com/flashplayer

October 2012

Delivery and Installation
Get the flash player here: http://www.adobe.com/flashplayer

October 2012

Leaves departing for Chicago from California (continued)


Get the flash player here: http://www.adobe.com/flashplayer

October 2012

Leaves departing for Chicago from California


Get the flash player here: http://www.adobe.com/flashplayer

October 2012


Schematic design for truck-loading configuration of custom-designed shelves to transport leaves



Get the flash player here: http://www.adobe.com/flashplayer

September 2012

Structural engineer final drawings for sculpture, Cambridge, Massachusetts
Get the flash player here: http://www.adobe.com/flashplayer

September 2012

More Leaf Progress
Get the flash player here: http://www.adobe.com/flashplayer

September 2012

Leaf Work
Leaf Work

Get the flash player here: http://www.adobe.com/flashplayer

September 2012

LED Light Testing
Get the flash player here: http://www.adobe.com/flashplayer

September 2012

Leaf Work


Get the flash player here: http://www.adobe.com/flashplayer

August 2012

Steel beam arrival
Get the flash player here: http://www.adobe.com/flashplayer

August 2012

Continued Work on Leaf Surfaces
Get the flash player here: http://www.adobe.com/flashplayer

August 2012

The Site
Get the flash player here: http://www.adobe.com/flashplayer

August 2012

Leaf Progress: Color in Action
Get the flash player here: http://www.adobe.com/flashplayer

August 2012

Further Progress on the Leaves
Get the flash player here: http://www.adobe.com/flashplayer

August 2012

Continued leaf progress
Get the flash player here: http://www.adobe.com/flashplayer

July 2012

Continued leaf progress: painting, vacuum bag process, and carbon fiber layer
Get the flash player here: http://www.adobe.com/flashplayer

July 2012


Leaf Progress

Get the flash player here: http://www.adobe.com/flashplayer

July 2012

Pipe Fabrication
Get the flash player here: http://www.adobe.com/flashplayer

July 2012

Structural Steel Frame--in Process

Get the flash player here: http://www.adobe.com/flashplayer

July 2012

ADM-Works making progress on the leaves

Get the flash player here: http://www.adobe.com/flashplayer

June 2012

Vector Fabricating receives rolled pipe, steel cap plates, and hardware for fabrication of sculpture structure.




Get the flash player here: http://www.adobe.com/flashplayer


June 2012

ADM-Works creating molds for carbon fiber leaves as well as transportation cradles for leaves.


June 2012

Mark Davis created individual hand-painted go-by samples for ADM-Works for final painting in California.



June 2012

ADM-Works engaged a strength test for the connection points between the carbon fiber leaves and the hardware which connects to the steel members.

Get the flash player here: http://www.adobe.com/flashplayer

February 2012

Vector and iron workers removing column cladding in order to create an accurate 3D scan of the entire traffic island.

Get the flash player here: http://www.adobe.com/flashplayer

February 2012, Los Angeles


Section of the carbon fiber material and the LED light strand.

Get the flash player here: http://www.adobe.com/flashplayer


December 2011

Model # 3 created for 3D image scanning for precise production.

Get the flash player here: http://www.adobe.com/flashplayer

October 2011


Model # 2 with LED lights for presentation to Children's Memorial Hospital team for consideration.


Get the flash player here: http://www.adobe.com/flashplayer

September 2011

Mark Davis model for presentation to donor.


Get the flash player here: http://www.adobe.com/flashplayer